Who shall Submit PCN?

  • Importers and downstream users placing hazardous (that are classified as hazardous on the basis of their health or physical effects) on the EU market have direct responsibility to submit Poison center notifications (PCN)
  • Distributors who distribute hazardous mixtures only in the same MS
  • An export-only product does not require notification

Nevertheless, all operators in the supply chain have the obligation to make sure they place on the market mixtures which are in compliance.

Yes. The imported mixture may be used at the first place of import by the importer themselves, or may be imported in Member State A and subsequently placed on the market also in Member State B. Since import is deemed to be “placing on the market”, a submission is required in both member States A and B.

The information must always be up to date for mixtures as long as they are placed on the market. If the product is no longer placed on the market, the company is not required to update the information.

Note that is no “expiration date” of a notification and the information is expected to remain in the system even after the product is no longer placed on the market.

Importers and downstream users placing hazardous mixtures on the market not notified already under national legislation must comply with the new PCN requirements from the following dates:

  • Mixture for consumer use: 1 Jan 2021
  • Mixture for professional use: 1 Jan 2021
  • Mixture for industrial use:1 Jan 2024

By 1 January 2025, a submission must be made for all mixtures on the market according to the harmonized Annex VIII requirements in CLP regulation.

The following information needs to be submitted.

  • Identification of mixture and submitter.
  • Hazard identification and additional information.
  • Information on mixture components

ACF GHS Report